Entratek Shop
Entratek load manager set for Power Arrow Dual and Power Dot Fix
Entratek load manager set for Power Arrow Dual and Power Dot Fix
plus 19% VAT
Couldn't load pickup availability
You want to use the maximum Standing charging power ideal for charging multiple electric cars With the Load Manager Set from Entratek you can simple, functional and cost-effective realize.
With an intelligent load management system Not only do you save the high investment costs of expanding your grid connection , but you also prevent peak loads, which in turn lead to an increase in your annual electricity bill. Furthermore, the existing capacity is optimally utilized.
Highlights:
- Specially designed for charging several electric cars at one location
- Load up to 252 electric cars
- The total available power is evenly across all connected electric cars distributed.
- Set consists of a load management hub and three current transformers (CT) .
- Can be combined with Entratek Wallbox Power Dot Fix & Entratek Power Arrow Dual
- Enables Load management without internet connection
- Single-phase as well as three-phase Operation possible
- LED indicator for indication of working condition
- Flexible installation of additional charging points and simple configuration
- PV surplus charging independent of the manufacturer and with three operating modes
!!! For the realization of the dynamic load management and PV charging becomes 1x Load Manager Set needed.
!!! For the realization of the PV surplus charging become 2 x Load Manager Set needed.
► Charge up to 252 electric cars
With an additional load manager set you can Charge up to 252 electric cars simultaneously without overloading the grid. If the possible charging power of all individual electric cars exceeds this value, the charging power of all charging stations is automatically reduced until sufficient power is available again. save You high costs for upgrading Your Power connection and make ideal use of the available performance.
► Load management works without an internet connection
The Power Dot Fix and Power Arrow Dual are each connected to an Ethernet switch or internet router via LAN cable and can communicate with each other locally. The load management works locally without internet connection and your Data are 100% safe .
► Flexible installation of additional charging points
An additional advantage is that Dynamic load management can be flexibly expanded . If, for example, the vehicle fleet grows, additional charging points can be installed quickly and easily.
► Record charging processes and bill electricity with backend
Thanks to OCPP, you can manage the charging stations with the load manager set in integrate various backend systems and thus remotely monitor the charging stations and individual Record charging processes , view and Manage users .
► Simple and flexible installation and configuration
The set is in available in two different versions : 100 A is ideal for single residential building , where 800 A is better suited for locations such as Company premises and apartment buildings . Installation is simple and intuitive. A user-friendly Configuration panel You can easily make the settings and adjust them at any time in the future.
► Implement PV surplus charging
Regardless of the manufacturer of the photovoltaic system You can implement surplus charging. It doesn't matter whether you already own a PV system or are planning to get one in the future. The set offers three operating modes to choose from: full, solar assist & solar only . This allows you to Charging electric cars with 100% solar power and thereby the Optimize your own consumption .
!!! For the realization of the dynamic load management and PV charging becomes 1x Load Manager Set needed.
!!! For the realization of the PV surplus charging become 2 x Load Manager Set needed.
Scope of delivery:
► Load management hub x 1
► Current transformer (CT) x 3




